Published:
Extensive report on ability of Dutch power system to accomodate 12 GW of wind (6 onshore, 6 offshore) in 2020. Requirements for flexibility, ... (PDF)
Organization: Frontier Economics2010 / 04
Published:
- Integration of 12GW of wind power is feasible under the assumption that available flexibility and interconnector capacity are used optimall... (PDF)
Organization: EnergieNed and Frontier Economics2010 / 04